Location
Type
Area
The Client, Tetrarch Capital, is an Irish-owned, Dublin-based real estate investment and development platform, active in the hospitality and leisure, residential and office sectors.
Project details
This new development on Townsend Street, Moss Street and Gloucester Street in Dublin 2 consists of the construction of an 8-storey 393-bedroom hotel, an 8-storey 136-bedroom aparthotel, an 8-storey 66-bedroom aparthotel and 21 apartments together with streel level retail units.
The 393-bedroom hotel has been developed for Travelodge with the apart hotel being developed for Staycity. They are also leasing a 142-unit aparthotel on nearby Mark Street. The 21 apartments are for Dublin City Council.
The project is located on a constrained city centre site which required a high degree of coordination between all design team members. The access to the site also needed to take into consideration the location of a busy street with high amount of pedestrian and motor traffic.
Axiseng assisted the client to develop the M&E detail for the project and review the hotel and aparthotel end-user requirements. The design was developed to encompass the end-user requirements.
The M&E services on the project included the design of VRF systems, ventilation systems, sprinkler system, LSS systems, TV / AV hotel systems and access control.