Location
Type
Area
Axiseng has worked with Google at its European headquarters in Dublin since 2010, delivering M&E design, commissioning and decarbonisation across its building portfolio.
Project details
EMEA HQ, Barrow Street: Axiseng led the M&E masterplan for the initial 30,000m² fit-out of all eight campus buildings. Designed concurrently and installed in phases alongside an early-appointed Management Contractor, it achieved LEED Gold. We later densified the campus and fitted out 1 and 2 Grand Canal Plaza.
Gordon House and Gasworks House: As Commissioning Agent (CxA), Axiseng helped both refurbished buildings (14,000m² and 13,800m²) achieve LEED Gold, reviewing contractor submittals, systems manuals, staff training and operations after completion. We are currently working on the next phase for both buildings.
Freeman House: A complete 3,615m² Eastpoint Business Park buidling refurbishment, fully electrified with all fossil fuels removed. We designed the services with HVRF, CO₂ heat pumps, heat recovery AHUs and a smart BMS, to LEED v4 Gold.
Grand Mill Quay: In this future-proofing project, we proposed multi-function air source heat pumps, instead of like-for-like chiller replacement, with a water-to-water heat pump for hot water and new AHU heating coils. The building now recovers heat from its chilled water and is ready for full electrification.
Dockmill: To achieve the full electrification of the building, we replaced gas-fired boilers with an air source heat pump, sited within a listed building with the client’s FM team, with new radiators for lower LTHW temperatures, while the live building stayed operational.
Barrow Street: A’Design Platinum (2014), IDA Gold (2013) and Fit-Out Office Large (2013).